Town houses and apartment buildings

Zinc, slate and chimneys, up where the city stops.

Standing-seam zinc, gutters soldered on site, mansard slate, chimney stacks rebuilt: roofing for town houses and apartment buildings, with the owner or with the managing agent.

Four stacks on the ridge

What we show before the first sheet of zinc comes off.

Ten-year insurance

The certificate comes with every quote.

RGE certified

The condition for insulation grants.

Safety before climbing

Scaffolding or guardrails in place before the first tile comes off.

Site left clean

Old tiles and offcuts taken away, gutters emptied.

Recent jobs

The view from our roofs

Scroll sideways

Rezé

Interlocking clay tiles

Roof renewed, dormer restored

A 1930s house re-tiled from ridge to gutter, with the dormer flashing redone in zinc.

12 days, 2025

Orvault

Natural slate, hooked

Natural slate, three dormers

A full slate roof hooked by hand, with the cheeks of three dormers rebuilt.

4 weeks, 2025

Nantes

Natural zinc

Standing-seam zinc roof

A low-pitched roof covered in zinc, the chimney flashing shaped and soldered on site.

9 days, 2024

Carquefou

Roof windows and flashing kits

Three roof windows for a loft conversion

A dark loft turned into two bedrooms, three windows cut into the tiled slope.

3 days, 2025

Vertou

Treated softwood

Rafters replaced before re-roofing

Rotten rafters found when stripping the roof, replaced before the new covering went on.

6 days, 2024

Saint-Sébastien-sur-Loire

Reclaimed canal tiles

Canal tiles re-laid on a stone house

Old canal tiles taken down, sorted and re-laid, the broken ones matched with reclaimed tiles.

8 days, 2024

Chimney pots on a zinc roof: every stack is flashed and soldered by hand.

From the first call to the handover

A city roof job, in four stages

We come and look

We climb onto the roof before pricing anything, and send you the photos of what we saw.

A written, detailed quote

Materials, area, scaffolding, waste removal: every line priced, the insurance certificate attached.

The work, on the agreed dates

The roof is made watertight every evening, even halfway through the job.

Handover and guarantee

We walk round the job with you and you sign the handover: the ten-year cover starts that day.

Good to know

Before you sign anything for your roof

After a storm

Report the damage to your home insurer within the time your policy allows, usually five working days: storm cover is compulsory in every home policy. Take photos and have the roof tarped, the insurer expects you to limit the damage.

Natural disaster status

It only applies once an order is published in the Journal officiel; you then have 30 days to declare. Wind damage usually falls under the storm cover instead.

Changing how the roof looks

A new material, a new colour or a new roof window means a prior declaration at the town hall. Processing usually takes a month, longer near listed buildings. We put the file together with you.

Insulation grants

Roof insulation can be funded by MaPrimeRénov' as part of a whole-home renovation, and by energy-saving premiums (CEE), provided an RGE-certified firm does the work. The rules change often: a France Rénov' adviser (0 808 800 700) will tell you what applies to you.

Door-to-door offers

We never knock on doors. If someone rings about "urgent" moss removal, remember that you have 14 days to cancel, and that no payment can be demanded within the first 7 days.

Ten-year cover

For ten years after handover, it covers damage that undermines the roof or makes the building unfit for use. Ask for the certificate: a serious roofer hands it over without being asked twice.

Streets and towns we cover

Where we work

44470

Carquefou

within 48 h

44240

La Chapelle-sur-Erdre

within 48 h

44000

Nantes

within 24 h

44700

Orvault

within 48 h

44400

Rezé

within 24 h

44800

Saint-Herblain

within 24 h

44230

Saint-Sébastien-sur-Loire

within 24 h

44120

Vertou

within 48 h

Once the scaffolding came down

What customers said

"The storm took half the ridge tiles on a Sunday night. The tarp was on by Monday noon, the photos went to the insurer the same day, and the repair was booked before the assessor had even called."
Sandrine L., Storm tarping, Rezé
"Two companies wanted to redo the whole roof. He went up, replaced about thirty tiles and a length of flashing, and told me the rest would hold for another fifteen years."
Gérard M., Leak repair, Orvault
"Our whole slate roof: scaffolding up on the Monday, tarped every evening, gutters redone in zinc, and a garden cleaner at the end than at the start."
Claire and Julien V., Slate roof renewal, Carquefou

Request a visit to the roof

Tell us the address, the type of building and what you have seen. For an apartment building, say who manages it: we arrange access with them.

Or call01 23 45 67 89